Transient electromagnetic detection construction analysis of gob-side entry retaining working face in Xingtai Mine and its significance of to geological work
Li Chao
Xingtai Mine, Jizhong Energy Resources Group Co., Ltd.,Xingtai 054000, China
The No.25305 and 25307 faces in Xingtai Mine were the working faces arranged by gob-side entry retaining, and the detection angle was arranged from gob-side entry retaining to the 2 working faces in the construction of transient electromagnetic. This arrangement had achieved good results in the detection of Xingtai Mine. The maps of each detection angle were analyzed, and the obvious low resistance range was not delineated after check and drilling verification. It had guiding significance for the geological work and transient electromagnetic construction of the mine.
李 超. 瞬变电磁探测对邢台煤矿地质工作的意义分析[J]. 煤炭与化工, 2022, 45(4): 73-75.
Li Chao. Transient electromagnetic detection construction analysis of gob-side entry retaining working face in Xingtai Mine and its significance of to geological work. CCI, 2022, 45(4): 73-75.