7611 high pumping alley of Wuyang Mine was a hard rock roadway, the medium and deep hole blasting technology was adopted, and the problem of slow drilling speed and great labor intensity happened during mining. In order to improve the mining speed of the 7611 high pumping alley, through the method of experiment and contrastive analysis, combined with the field geological conditions, the mechanized operation line composed of drilling, installation and transportation equipment of 7611 high-pumping roadway was put forward, namely drilling and installation machine + belt conveyer. The field application showed that the mining speed was improved obviously.
常春锋. 五阳矿硬岩巷道快速掘进钻、装、运设备选型研究[J]. 煤炭与化工, 2019, 42(5): 94-96,51.
Chang Chunfeng. Study on selection of the loading equipment for fast mining in the hard strata of Wuyang Mine. CCI, 2019, 42(5): 94-96,51.