According to sihe No.2 97 panel bolting supporting excess, the characteristics of the high cost, by means of theoretical calculation and numerical simulation, the design concept of coupling pressure equalization support is introduced. The design parameters of the new support system of the 97 panel roadway were determined, which reached the goal of safe, economic and fast excavation of the roadway, which was very important for the safety and economic exploitation of the 97 mining area Practical significance. And it provides the reference and the basis for the mine roadway support design under the similar condition.
贾大伟. 寺河二号井九七盘区大巷支护技术研究[J]. 煤炭与化工, 2017, 40(3): 48-52,57.
Jia dawei. Study on the support technology of the 97 panel of the No.2 Well in Sihe mine. CCI, 2017, 40(3): 48-52,57.