Abstract:In this paper, the No.8470 Face of Yangdong Mine was taken as the research object. The comprehensive geophysical exploration work of the working face was discussed in detail, especially the selection of the implementation means of geophysical exploration and the on-site working methods of the working face. And the adaptation scope and analytical methods of the selected geophysical exploration methods were described in detail. Through the above type of research, it was of guiding significance to carry out the geophysical exploration work of water prevention and control in the same coal seam working face.
曹 栋. 羊东矿4号煤工作面防治水综合物探研究[J]. 煤炭与化工, 2023, 46(5): 48-52.
Cao Dong. Study on comprehensive geophysical exploration of water prevention and control in No.4 Coal Seam face of Yangdong Mine. CCI, 2023, 46(5): 48-52.