Based on complicated hydrogeological condition and strongly karstification in graben tectonic unit of west wing, water bursting conditions of graben tectonic unit in second level west wing were analyzed.Source of water bursting and recharging channel were preliminary found out, necessity and feasibility of water plugging were proved, which provided theoretical basis for proposing further water plugging scheme.
王立伟. 大社矿二水平西翼地堑构造单元突水条件分析[J]. 煤炭与化工, 2017, 40(6): 57-60.
Wang Liwei. Water bursting condition analysis of graben tectonic unit in second level west wing of Dashe Mine. CCI, 2017, 40(6): 57-60.