In order to study the strong mining pressure in large mining height fully mechanized working face, the top plate control effect is not good, Xin'an Mine 3406 large mining height working face was taken as an example, one side of the mining air irregular long wall face mine pressure observation program and implementation method was introduced. Through the field observation and related data analysis, the results of the working face mining pressure manifestation law, characteristics and hydraulic support working condition were got, with corresponding safety technology measures and suggestions, making one side mining irregular long-wall face top plate be effectively controlled, which provided a good reference for the safe and efficient mining of similar working face.
安兴龙. 不规则工作面矿压观测及显现规律研究[J]. 煤炭与化工, 2020, 43(10): 12-14,18.
An Xinglong. Study on irregular working face mining pressure observation and its behavior law. CCI, 2020, 43(10): 12-14,18.
[ 1 ] 宋振骐,郝 建,汤建泉,等. 断层突水预测控制理论研究[ J ]. 煤炭学报,2013,38( 9 ):1 511 - 1 515.
[ 2 ] 李学华,姚强岭,张有乾. 考虑层间剪应力作用的煤矿岩层控制理论探讨[ J ]. 岩土力学,2018,39( 7 ):2 371 - 2 378.
[ 3 ] Holla L. Ground movement due to longwall mining in high relief areas in New South Wales, Australia[ J ]. International Journal of Rock Mechanics and Mining Sciences, 1997, 34( 5 ): 775 - 787.
[ 4 ] Booth C J, Spande E D. Potentiometric and aquifer property changes above subsiding longwall mine panels, Illinois basin coalfield[ J ]. Ground Water, 1992, 30( 3 ): 362 - 368.
[ 5 ] Richard R, Randolph J, Zipper D. High extraction mining, subsidence, and Virginia’s water resources, chapter 4. Subsidence Effects on Water Resources[ J ]. Virginia Center for Coal & Energy Research. Virginia Polytechnic Institute and state University, Virginia, 1990: 17 - 20.
[ 6 ] Peng S S, Ma W M, Zhong W L. Surface subsidence engineering
[ M ]. Society for Mining,Metallurgy, and Exploration, 1992.
[ 7 ] Palchik V. Formation of fractured zones in overburden due to
longwall mining[ J ]. Environmental Geology 2003,44: 28 - 38.
[ 8 ] Majdi A, Hassani F P, Nasiri M Y. Prediction of the height of destressed zone above the mined panel roof in longwall coal mining[ J ]. International Journal of Coal Geology, 2012, 98: 62 - 72.
[ 9 ] 温志强,石亮.大采高综采工作面矿压显现规律数值模拟研
究[J].能源与环保,2019,41( 4 ):143-146,150.
[ 9 ] 陈荣华,钱鸣高,缪协兴. 注水软化法控制厚硬关键层采场来压数值模拟[ J ]. 岩石力学与工程学报,2005( 13 ):2 266 - 2 271.
[ 10 ] 马旭克,李旭亚.大断面硬岩巷道快速掘进六位一体关键技
术的研究与应用[J].能源与环保,2019,41(1):148-152.
[ 11 ] 张佳飞. 残煤复采综放工作面围岩控制及支架选型研究[ D ].
太原:太原理工大学,2018.
[ 12 ] 刘宝敏,李延河.三软煤层沿底托顶煤巷道数值模拟研究
[J].能源与环保,2019,41( 1 ):143-147.
[ 13 ] 蒋国芳.三软煤巷掘进工作面应力集中数值模拟分析[J].能
源与环保,2019,41( 1 ):167-171,176.
[ 14 ] 陈鹏飞.沿空留巷巷道围岩变形破坏特征及影响因素研究
[J].能源与环保,2019,41( 2 ):159-162.
[ 15 ] 刘建功.复杂条件下软岩巷道底鼓综合治理技术研究与应
用[J].能源与环保,2019,41( 2 ):178-182.