Central Control Design of Ningjin Salt Chemical Industry Park Cogeneration First Phase Project
SUN Feng-yu1, CHEN Yan2
1.Hebei Energy Engineering Design Corporation Ltd., Shijiazhuang 050031, China; 2.Xingtai Power Supply Subsidiary of State Grid Corporation Hebei Electric Power Corporation, Xingtai 054000, China
Aiming at the characteristics of Ningjin Salt Chemical Industry Park cogeneration first phase project, it is pointed out that on the basis of the relative central control, locally scattered layout the auxiliary system operator station, the recommended solutions are: central control room and electronic room are arranged on row B-C at operating layer in main power building, compressed air station control room, chemical water treatment control room and integrated control room are arranged locally in the common system area. Features of the solution are: construction area of the main plant building is reduced, layout is flexible, operation is easy.
孙丰瑜,陈 岩. 宁晋盐化工园区热电联产一期工程集中控制设计[J]. 煤炭与化工, 2015, 38(7): 122-124.
SUN Feng-yu, CHEN Yan. Central Control Design of Ningjin Salt Chemical Industry Park Cogeneration First Phase Project. CCI, 2015, 38(7): 122-124.