Dongrui Mine underground recovery working face set bottom drainage roadway to drainage gas, the drainage method, pipe settlement, pump station equipment selection, etc were discussed, coal seam occurrence of gas mine gas extraction problem and attention in middle-east Qinshui coalfield and southeast Huodong Mine were analyzed, with reasonable advice.
张卫东. 高瓦斯矿井底抽巷瓦斯抽采设计研究[J]. 煤炭与化工, 2015, 38(6): 55-57.
ZHANG Wei-dong. Study on High Gas Mine Pumping Roadway Pumping Gas Design. CCI, 2015, 38(6): 55-57.