In view of the geological structure development of the west plate area of the No. 2 Mine in Zhaozhuang, the direct roof of the coal seam was mudstone, the thickness varied greatly, and the weathering and crushing caused the difficulty of the deformation control of the roadway. The shotcreting and two sides grouting reinforcement were used to prevent mudstone roof weathering damage and forms an arched complete carrier in the surrounding rock of the roadway to achieve the purpose of common bearing. The underground test showed that there was no obvious cracking in the surface sprayed layer, and the deformation of the surrounding rock of the roadway was effectively controlled. The maximum displacement of the top and bottom plates was 142 mm, and the maximum shrinkage of the two sides was 37 mm.