Based on the increasing mining depth and mining pressure of Dongpang Mine, leading to the long period of roadway construction, underground support parameters and corresponding mining and transportation equipment were designed, based on the geological condition of working face, the reasonable mining technology was set, mining ahead achieved 240 m per month, greatly reduced materials and labor in second anchor net building.
陈永现. 深部水平煤巷大断面一次成巷快速掘进技术研究[J]. 煤炭与化工, 2018, 41(2): 65-66.
Chen Yongxian. Study on rapid mining of deep level roadway section into roadway once. CCI, 2018, 41(2): 65-66.