No. 4 coal seam with large thickness and hardness of roof coal in Shaanxi Huoshiju Mine, delayed top coal caving, large coal block plugging caving position, periodical pressure energy appear as adopting top coal caving mining, which affect the mining rate and the safety of recovery mining. Deep hole blast pre-fracture technology was adopted in 8501 working face, the practice showed that the technology was effective, with good economic and social benefit and promotion value.
王华东,苗文韬,许光辉,李胜虎. 深孔爆破预压裂技术在综放开采坚硬顶煤中的应用[J]. 煤炭与化工, 2016, 39(7): 69-72,75.
Wang Huadong, Miao Wentao, Xu Guanghui, Li Shenghu. Application of deep hole blast pre-fracture technology in hard top coal fully mechanized mining. CCI, 2016, 39(7): 69-72,75.