Aiming at the problem of the actual site environment and the backward operation technology of the hydraulic support in the fully mechanized coal mining face, a new platform for the hydraulic support of the fully mechanized coal mining face is designed and researched. The structure, transportation and installation platform structure are designed to complete the transportation and installation of the hydraulic support, which provides a theoretical basis for the follow-up study.
杨世坤. 煤矿综采工作面运装平台的总体结构设计研究[J]. 煤炭与化工, 2017, 40(9): 137-140.
Yang Shikun. Design and Research on the Overall Structural of Transportation and Installation Platform in Coal Mining Fully Mechanized Face. CCI, 2017, 40(9): 137-140.