In the process of gas control, the protective layer was set to extract gas in protected seam, and fracture of bottom plate was to be evacuated from the protective layer in mining process. Combining with protective layer conditions in 3527 working face, gas drainage borehole was made. At the same time, the effect of gas drainage was analyzed by parameters of gas concentration and extraction purity, etc. Therefore, this method was determined and it had obvious effect on control coal gas in lower coal seam.
高 翔. 近距离上保护层底板岩层钻孔瓦斯抽采技术[J]. 煤炭与化工, 2017, 40(9): 79-82.
Gao Xiang. Technology of drilling gas extraction in the bottom of protective layer at close distance. CCI, 2017, 40(9): 79-82.