Based on coal dust explosion threat of Liangbei Mine, based on coal seam occurrence conditions of the mine, combined with working face blower construction of coal seam gas drainage borehole, drilling hole sealing tube was used to wet coal body by coal seam water injection, the technology reduced the dust concentration in the working face, diluted the gas of coal seam fracture, ensured the safety of people.