Discussion of fully-mechanized face rushing through collapse column technology in high gas mine
Kang Yang1, Chen Li2
1.Gaohe Energy Corporation Ltd., Shanxi Lu’an Group, Changzhi 047100, China;2. College of Mining and Surveying Engineering, Hebei University of Engineering, Handan 056038, China
In order to realize fully-mechanized mining face rushing through collapse column, W1309 fully-mechanized face in Gaohe Coal Mine was taken as research object. On the basis of analysis and research on storage characteristics of collapse column, integrated technology of preliminary grouting, mining height controlling, roof netting and monitoring was proposed combining the reality of working face production, which successfully forced through collapse column. The results showed that this technology application had good effect, short period and safety and reliable, which could provide experience and technical guidance for same or similar mining collapse column.
康 阳, 陈 立. 高瓦斯矿综采面快速过陷落柱技术探讨[J]. 煤炭与化工, 2016, 39(9): 155-157,160.
Kang Yang, Chen Li. Discussion of fully-mechanized face rushing through collapse column technology in high gas mine. CCI, 2016, 39(9): 155-157,160.