Application of pre-grouting and back wall grouting in water prevention and control shaft construction
Fan Huaxiao1,2
1.College of Mining Engineering of Taiyuan University of Technology,Taiyuan 030024,China; 2. Panjiayao Mine,Datong Mining Group Ltd.,Datong 037003, China
Freezing method was adopted in the initial design of inlet air vertical shaft of some mine, in order to shorten shaft construction period and reduce the cost of construction, the original plan was change to normal construction, pre-grouting technology was adopted crossing aquifer in shaft construction, with back wall grouting to water position of shaft wall after shaft going down. The practice showed good water control effect, provided experience for vertical shaft water prevention and control under similar condition.
范华霄. 预注浆和壁后注浆在立井施工防治水中的应用[J]. 煤炭与化工, 2016, 39(6): 74-76,81.
Fan Huaxiao. Application of pre-grouting and back wall grouting in water prevention and control shaft construction. CCI, 2016, 39(6): 74-76,81.