During support pressure action period, especially under three soft coal seam along gob-side entry driving conditions, coal roadway anchor net supporting construction technology was confined. Xiandewang Mine, according to stope mine pressure theory practical mine pressure observation and laboratory data,found the relationship between high strength bolt pre-tightening force and tightening torque and reasonably confirmed high strength bolt initial prestressing force, ensuring the initial safety of roadway supporting.