In order to improve comprehensive benefit of coal production and prolong the service life of mine, reasonable mining should be conducted under buildings, new stopping was settled based on place relationship between adjusted fully mechanized working face stopping line place and ground building. The result showed that the adjusted stopping line exerted the least influence on ground building deformation, with successful mining.
詹云虹. 范各庄矿综采工作面停采线位置确定研究[J]. 煤炭与化工, 2015, 38(4): 44-45.
ZHAN Yun-hong. Study on Fangezhuang Mine Fully Mechanized Working Face Stopping Line Location. CCI, 2015, 38(4): 44-45.