In order to improve coal production and reduce production cost, Lvliang Mine recovery working face crossing large fault and non-coal pillar needs vibration shot, with trivial program and huge cost, which affects working face advancing and production, combined with the mine geological structure, recovery working face crossing large fault and non-coal pillar advanced pre-splitting blasting technology was put forward with success.
陈小军. 回采工作面过大断层、无炭柱超前预裂爆破技术研究与应用[J]. 煤炭与化工, 2015, 38(5): 101-103.
CHEN Xiao-jun. Research and Application of Recovery Working Face Crossing Large Fault and Non-coal Pillar Advanced Pre-splitting Blasting Technology. CCI, 2015, 38(5): 101-103.