In order to analyze the reasonableness of the roadway support scheme and support parameters in Xinyuan Mining Industry, field measurements were used to conduct the study. Firstly, a scientific and reasonable on-site roadway displacement and stress monitoring scheme was designed for the roadway geology and mining conditions. After sorting out the field monitoring data, the displacement and time change curve and the stress and time change curve were got to analyze the displacement of roof and floor and the displacement of two sides of roadway, as well as the stress of roof and anchor cable of two sides of bolt. By measuring the displacement of the roof and floor and the stress of the anchor and anchor cable on the spot, the support effect of the roadway was analyzed. From the coordinated synchronization of the displacement curve and the stress curve after the excavation is stabilized, with good support effect. Through on-site monitoring and empirical judgment, the deformation of the surrounding rock of the roadway was effectively controlled, which can provide reference and reference for the stable control of the surrounding rock of the roadway under similar conditions, with application and promotion value.