10202 fully mechanized working face one time mining height of Ciyaogou Mine of Shanxi Coal Transportation Group was taken as example, rib spalling, support remove, wasted coal rolling in the working face were analyzed, the corresponding measures of supporting equipment optimization of the three machines and recovery process, weakening control of hard roof and safety control of coal wall were given, with good application effect.
张 磊. 磁窑沟煤矿大采高综采技术问题分析及优化对策研究[J]. 煤炭与化工, 2018, 41(8): 10-12.
Zhang Lei. Study on technical problem and optimization plan of large mining height technology in Ciyaogou Mine. CCI, 2018, 41(8): 10-12.