In this paper, the long screw structure of MG450/1050-WD shearer used in Wangyun Coal Mine is taken as the research object. Aiming at the fatigue failure problem caused by resonance, a simulation analysis model is established. Through modal analysis, harmonic response analysis and fatigue analysis, it is determined that the long screw has the risk of resonance and fatigue failure under the conditions of 94 Hz and 153 Hz. Based on this, an optimized design scheme for vibration reduction by adding rubber blocks is proposed. The fatigue life of each part of the optimized long screw structure is significantly improved, which verifies the feasibility of the vibration reduction scheme.
郭建国. 望云煤矿采煤机长螺杆减振方案设计研究[J]. 煤炭与化工, 2025, 48(3): 85-88.
Guo Jianguo. Research on vibration reduction scheme design of long screw of shearer in Wangyun Coal Mine. CCI, 2025, 48(3): 85-88.