Abstract: In this paper, taking the transient electromagnetic detection of No.06202 ( II block ) Face in Yangdong Mine as an example, the influence of transportation track on transient electromagnetic detection in roadway detection was briefly described. The methods of data correction and abnormal shape elimination were analyzed by means of data simulation, and the effect comparison before and after roadway data processing was analyzed. This paper expounded the effect of the method to improves the quality of detection data interpretation in the process of transient electromagnetic processing of fixing and same good conductor in the roadway.
吕光朋. 羊东矿运料道瞬变电磁探测中良导体干扰的处理[J]. 煤炭与化工, 2023, 46(9): 65-68.
Lv Guangpeng. The processing of good conductor interference in transient electromagnetic detection of Yangdong Mine transport roadway. CCI, 2023, 46(9): 65-68.