For the construction of high-stress soft coal seams, the drilling was prone to collapse, the hole clogging, the scalar purity of the extraction was fast, the gas control effect was not ideal, and the characteristics of rapid excavation were affected. Based on the original model of the gas trilogy, comprehensive gas remediation measures such as drilling and drilling, increasing reverse drilling, plenum pre-draining and bottom gas pre-pumping were adopted, which greatly improved gas drainage efficiency, eased the pressure of rapid roadway excavation, and a new model of gas control under special geological conditions was explored.