Based on No. 15 mine coal and gas outburst of Qingciyao Mine of Datong Mining Group, according to gas drainage test, 3 recovery mining face gas drainage plans were analyzed, double roadway mining was settled, horizontal long drilling was adopted in No. 15 coal seam, gas drainage drilling arrangement and extraction technology were settled, without coal and gas outburst after the implementation, ensuring the safe mining and providing reference for gas control and prevention.
赵亮青. 回采工作面瓦斯抽放方案设计与选择[J]. 煤炭与化工, 2018, 41(5): 111-113.
Zhao Liangqing. Design and selection of recovery working face gas drainage. CCI, 2018, 41(5): 111-113.