In order to make Donghuantuo Mine 2025 working face stopping successfully, solve negative factors induced by geologic structure in mining, shrink surface and big and small surface were jointed, the construction plan and problems needs to be paid attention were expounded, the requirement of the technology was put forward. The practice showed that the working face crossed the geological structure influencing area, ensured the safe production and remarkable economic benefit.
李海波. 大小面对接工艺在东欢坨不规则工作面的应用[J]. 煤炭与化工, 2016, 39(1): 118-120.
Li Haibo. Application of big and small surface joint technology in irregular working face of Donghuantuo Mine. CCI, 2016, 39(1): 118-120.