SQ-80/110 endless-rope winder transportation was applied in 3013 working face of auxiliary air duct. Endless-rope winder was installed in copper chamber of endless rope winch outside air duct, and adopted parallel arrangement. Concrete pouring construction was used in winch foundation, as well as hanging wire veritical drop location and secondary positioning technology before casting, which guaranteed its accurate positioning.