Pk301 is one of the important equipments of 4×105 t/a polypropylene project in Pucheng Clean Energy Chemical Limited Company. In view of Pk301 units shut down abnormally in the process of recycling recovery of the low pressure propylene gas to the high pressure propylene scrubber. The reasons that caused Pk301 shut down which are abnormal vibration of cylinder block, the higher temperature in the secondary outlet and lower pressure in the first inlet were analyzed. The corresponding solutions were presented.
王 齐,贾 珮,周 涛. 聚丙烯生产中Pk301异常跳停原因分析及处理[J]. 煤炭与化工, 2015, 38(6): 153-154.
WANG Qi1, JIA Pei2, ZHOU Tao1. Reason Analysis and Solution of Pk301 Abnormal Shut Down in the Production of Polypropylene. CCI, 2015, 38(6): 153-154.