Based on the difficult support and boundary coal in 2108 working face of Changxing Mine, combined with conditions for the coal resources occurrence, continuous mining scheme of 2108 working face boundary coal was designed. The practice showed that the plan enabled to ensure the safe mining of the working face, reduce the working face removing, improve the continuous mining. The strengthened support ensured the safe mining of boundary coal in 2108 working face.