|
|
|
| Study on removing slide defects on scraper conveyer |
| Shi Xiaochen |
| Gushuyuan Mine, Jincheng Mining Industry Group, Jincheng 048000, China |
|
|
|
|
Abstract In order to solve the slide problem of scraper conveyer, combined with the production site, the corresponded measures of removing slide in scraper conveyer were set to ensure the safe mining.
|
|
|
|
|
|
| [ 1 ] 张 建. 大倾角复合顶板综采工作面安全管理[ J ].煤炭科技,2001( 4 ):76 - 78.
[ 2 ] 刘世峰,侯胜杰. 综采工作面刮板运输机上窜下滑控制实践[ J ]. 中州煤炭,2012( 2 ):71 - 72.
[ 3 ] 刘建辉. 综采工作面刮板运输机 “上窜下滑”机理及其控制[ J ]. 煤炭工程,2013,45( 8 ):63 - 65.
[ 4 ] 杨 威. 综采工作面大倾角开采技术[ J ].煤矿安全,2011,42( 4 ):58 - 59. |
|
|
|