|
Abstract Zhangcun Mine was taken as an example, the mechanized rapid gob-side entry technology for thin coal seam was studied, including slitting drill, permanent magnetic electric roller belt conveyor, hydraulic excavator, etc., which ensured the coordinated, continuous, efficient and safe operation of each equipment, and free as many workers as possible from the high-risk environment, realized less personalized, safe and efficient stay-alley operation.
|