| Study on the application of goaf retention in high water material roadway filling |
| Zhao Xinnan1,2,3 |
1. Mine Oil Products Branch, Coal Science and Technology Research Institute Company, Beijing 100013, China;
2. Coal Resources Exploitation and the State Key Laboratory of Environmental Protection, Beijing 100013, China; 3. National Energy Technology and Equipment Laboratory of Coal Utilization andEmission Control, Beijing 100013, China |
|
|
|
|
Abstract Goaf roadway retention in coal mines had the advantages of improving coal recovery rate, reducing the amount of mining roadway and facilitating the replacement of mining. In order to reduce the cost of roadway in Changcun Mine, alleviate the pressure of the excavation, the filling technology on high water material instead of small coal pillar roadway protection was adopted, according to the field condition, high water material water cement ratio of 2:1, beside the roadway width was 1 m, filling and supplemented by strengthening technology with advance roadway supporting and reinforcing guarantee for the effect, after implementation, working face coal pillar mining was realized, mining was decreased, saving more than 7 million yuan, the technology provided the safeguard for the mine production efficiency.
|
|
|
|
|
|
| [ 1 ] 张自政,柏建彪,王卫军,等. 沿空留巷充填区域直接顶受力状态探讨与应用[ J ]. 煤炭学报,2017,42( 8 ):1 960 - 1 970.
[ 2 ] 李西凡,熊祖强,王 鹏. 高水巷旁充填材料力学性能改进试验研究[ J ]. 中国安全科学学报,2020,30( 5 ):95 - 100.
[ 3 ] 苗 鹏. 综采工作面高水充填沿空留巷技术应用实践[ J ]. 能源技术与管理,2020,45( 3 ):92 - 94.
[ 4 ] 毕延强. 沿空留巷巷旁充填体特性及施工工艺研究[ J ]. 山东煤炭科技,2020( 2 ):50 - 52.
[ 5 ] 王 学,潘泽勇. 高水材料巷旁充填技术在安益煤业的应用[ J ]. 能源技术与管理,2019( 6 ):140 - 143.
[ 6 ] 贾海平. 高水充填材料在同昌矿沿空留巷的应用[ J ]. 能源与节能,2020( 11 ):155 - 156.
[ 7 ] 陈 阳,柏建彪,陈 勇. 锚杆支护巷旁充填沿空留巷技术研究[ J ]. 矿山压力与顶板管理,2005( 2 ):74 - 75.
[ 8 ] 熊祖强,熊志朋,孙亚鹏,等. 沿空留巷高水材料巷旁充填系统改进及应用[ J ]. 煤矿安全. 2017,48( 3 ):106 - 109. |
|
|
|