The temperature monitoring method of new-type mine freezing construction was taken as the study object, the influence factors of temperature change was analyzed, the application of ANASY in freezing construction and the grid divide model of factors were discussed, the effects of temperature changes were obtained, the main factors that influence the change of the temperature in the middle and outer one rows were solved,with main factors influencing the temperature change, which provided a reference for future research in this area.