Through summing up Menkeqing Mine vertical shaft frozen construction, western Erdos different ground freezing parameters selection was mastered, through the adoption of new type of refrigeration equipment, information technology to strengthen the construction process of detection and control, site supervising implementation with the combination of remote monitoring, which provided a powerful guarantee for safe production and accumulated freezing construction experience for the future.