According to poor cementation of the former coal mine gob roof in kangcheng mine, second mining roadway construction and second mining face situation, complex integrated mining technology was conducted. Practice has proved that: optimizing the use of appropriate methods and roadway mining technology to ensure safe mining face as much as possible while the recovery coal resources, provided reference and guidance for similar mine.