Through the analysis of the 12802 working face demolition and installation of 12806 face in Yunjialing Mine, the most critical part of the working face production process was deeply studied. Support recycling process, sequence, geological conditions of roadway and working face good or not decided support recycling and installation of speed, which restricted the production, was a special process in fully mechanized working face support recycling and installation.
班寿滨. 大坡度大采高综采支架整体搬家工艺研究与应用[J]. 煤炭与化工, 2014, 37(2): 97-98,155.
BAN Shou-bin. Steep Great Mining Height Fully Mechanized Support Whole Move Technology Research and Application. CCI, 2014, 37(2): 97-98,155.