Based on the complex geological condition and transportation of Zhaozhuang Mine, multiple devices operate simultaneously with large labor, difficult management and low production efficiency, E1305 working face transportation roadway control system was improved, domain transmission control network was formed according to power line carrier data communication method, realizing remote centralized control of transportation system, reducing the number of people and employees and improving productivity.