In order to calculate surface subsidence value, oblique deformation value, curvature deformation value and horizontal deformation value after mining S-1231 working face, probability integral method and the software developed by probabilistic integration method were used to calculate surface deformation after mining. The calculation results were compared with protection standards in "three down" regulations, which showed that the ground building would be damaged by secondary damage specified in the procedure after mining,, and the building needed to be repaired before its usage.
朱艳华. 煤矿井工开采地表村庄建筑变形量计算[J]. 煤炭与化工, 2017, 40(7): 102-105.
Zhu Yanhua. Deformation calculation of of surface village building in coal mine. CCI, 2017, 40(7): 102-105.