Based on driving speed of high pumping lane was seriously lagging behind, optimization design and new methods of system lane were discussed. What’s more, three original roadway combinations of high pull off lane, high pumping lane and high pumping gangue slope slip with correlative functions of baiting, gangue and air reture were put forward, which decreased quantities of roadway drivage and achieved initial success.
梁立鹏. 综放工作面走向高抽系统巷优化设计[J]. 煤炭与化工, 2016, 39(11): 60-61,64.
Liang Lipeng. Optimization design of high pumping system lane in fully mechanized caving face. CCI, 2016, 39(11): 60-61,64.