Based on geological conditions,engineering quality and personnel operations in production process,safety production of fully mechanized top coal caving face was easily affected by transport plane and inverted frame. Taking 28416 fully mechanized caving face of Guandi Mine as example, reasons,hazards,and corresponding measures about how to successfully control transport plane and inverted frame were researched, which put forward scientific solutions, optimized production process, ensured normal production of working surface and guranteed operation safety of personnel, showing that it could be used widely in every fully mechanized top coal caving face.
琚素英. 综放工作面控制运输机窜动和倒架的技术研究[J]. 煤炭与化工, 2016, 39(11): 51-53.
Ju Suying. Technology research of control transport plane and inverted frame in fully mechanized top coal caving face. CCI, 2016, 39(11): 51-53.