Based on the features of shaft and loading belt cabinet, the thickness of frozen wall was calculated, the frozen plan of main hole once frozen with rib spallingproof hole and strengthening hole was settled, the frozen process was monitored. The result showed that frozen wall temperature field enables to form and develop vastly and hand in circle during frozen station operation.