Pingdingshan Mining Industry No. 6 Mine 戊9-10-22170 fully mechanized working face influenced by complex stress of fault and upper overlying coal column, large area of rib spalling roof caving ahead of support roof increases the difficulty of roof management, delays the advancing of working face and brings negative effect of safe mining. Based on this problem, the pre-grouting of machinery roadway and air return roadway and injection of Malisan N type grouting material along with the working face mining reinforces the broken coal wall and roof in working face, improves the advancing of working face and ensures the safe mining.
余帅雷,王学民,张世锋,张永恒,贾 倩. 马丽散在断层带和上覆煤柱复杂应力区的应用[J]. 煤炭与化工, 2016, 39(6): 121-123.
Yu Shuailei, Wang Xuemin, Zhang Shifeng, Zhang Yongheng, Jia Qian. Application of Malisan in complex stress area of fault zone and overlying coal pillars. CCI, 2016, 39(6): 121-123.