Dashucun Mine was with gas burst, in order to control gas and coal outburst, gas control, dust prevention in recovery working face, short arm coal seam high pressure water injection pre-fracture technology was conducted in 172106 fully mechanized caving face, with safe and economic effect.
杜树安,李春彩. 回采工作面短臂煤层高压注水预裂技术的应用与效果研究[J]. 煤炭与化工, 2016, 39(4): 8-11.
Du Shu'an, Li Chuncai. Application and effect research of recovery working face short arm coal seam high pressure water injection pre-fracture technology. CCI, 2016, 39(4): 8-11.