Based on Limin No. 9 coal Concentrated Coal Cabin construction problem, combined with the actual underground situation of Limin Mine, normal reversed well construction was adopted, construction process and parameters were introduced, the attentions in the construction were put forward. The project practice showed that the technology was feasible, the construction was safe, and provided technical experience and reference for similar conditions.