Study on fully mechanized caving goaf air leaking speed based on tracing technology
Li Kaibo1, Chen Long2
1. Xiegou Mine, Shanxi Xishan Jinxing Energy Corporation Ltd., Lvliang 033000, China; 2. School of safety engineering, China University of Mining and Technology, Xuzhou 221116, China
In order to study air leaking law in 23107 fully mechanized working face goaf of Xiegou Mine, tracing technology (SF6 as tracing gas), the air leaking speed was measured as 0.04~0.2 m/s, fluid calculation software ANSYS was simulated to detect the distribution depth of different air leaking speed to guide the fire prevention and control. The result showed that 0.04 m/s air speed with the contour line about 14 m away from the working face, 0.06 m/s air speed with the contour line about 12 m away from the working face, 0.2 m/s air speed with the contour line about 3 m away from the working face, 0.04~0.2 m/s air speed with the contour line about 0~3 m m away from the working face.
李凯博1,陈 龙2. 基于示踪技术的综放工作面采空区漏风风速研究[J]. 煤炭与化工, 2018, 41(10): 104-107.
Li Kaibo1, Chen Long2. Study on fully mechanized caving goaf air leaking speed based on tracing technology. CCI, 2018, 41(10): 104-107.