By investigation and analysis of hydro-geological data and shaft up and down around, combining with the working face hydrological data, the systematic analysis of the mine water filling factors and hydrogeological conditions were conducted. Big well method was used to predict the impact of mining activities on the aquifer, and the ordovician limestone water inrush risk was evaluated, which provided the powerful safeguard for mine water prevention and control work, ensured the safety of mine production.