Abstract In order to increase mine ability against the flood disaster, prevent and reduce water accident, secure the safety of mine workers, combined with the actual situation of the mine, strong drainage system at the -480m level was built, through the scheme contrast optimization, the strong drainage scheme drilling straight to ground was selected.
|