| Application of filling pillar in crossing abandoned roadway support in large mining height working face |
| Sun Houming |
| Changzhi Xianquan Coal Industry Co., Ltd., Jinneng Holding Equipment Manufacturing Group, Changzhi 046000, China |
|
|
|
|
Abstract In order to solve the problem that there were a large number of empty roadways in No. 15105 Face of Xianquan Coal Industry in Changzhi, which may lead to roof accidents caused by strong dynamic load during the mining process, FLAC3D numerical simulation software was used to calculate the advance support stress during the working face near the abandoned roadways, and the filling pillar parameters were designed according to this. The same material was used to obtain different compressive strength supports, which met the different structural requirements of filling pillars. The practice proved that after the filling pillar was used to support the open roadway of the working face, there was no large-scale sheet wall, roof collapse and support crushing in the process of mining, and the working face passed through the open roadway smoothly.
|
|
|
|
|
|
| 1 ] 白玉军,王 斌. 浅埋煤层综采工作面过大断面空巷围岩变形及支护[ J ]. 山西大同大学学报(自然科学版),2023,39( 2 ):108 - 112.
[ 2 ] 张 煜. 无机材料充填空巷技术和应用效果分析[ J ]. 江西煤炭科技,2023,77( 1 ):16 - 18.
[ 3 ] 曹国选,赵米真,牛秦玉,等. 龙华矿20112工作面过空巷支护技术研究[ J ]. 煤炭技术,2022,41( 12 ):86 - 88.
[ 4 ] 马晋琴. 高水充填材料在工作面过空巷中的应用[ J ]. 山西化工,2023,43( 5 ):155 - 156. |
|
|
|