|
|
|
| Study on exploration and prediction of fault structure in long tendency distance and large mining width working face |
| Li Shenglin |
| Lvjiatuo Mining Company, Kailuan Energy Chemical Co., Ltd., Tangshan 063100, China |
|
|
|
|
Abstract With the extension of coal mining to the deep part of the mine, the geological structure is becoming more and more complex. In addition to the layout of the long tendency distance and large mining width working face, the hidden disaster-causing factors inside the working face bring a series of safety hazards to the safe and efficient mining of the working face, and the geological guarantee technology must be further improved. Based on the actual working experience of No.6272 face in Lvjiatuo Mine, this paper summarized and put forward the ideas of exploration, prediction, prevention and control of hidden disaster-causing factors in long tendency distance and large mining width working face from the aspects of comprehensive analysis of basic data, strengthening the application of geophysical and drilling methods and strengthening tracking and observation on site.
|
|
|
|
|
|
| [ 1 ] 卫金善,张晋武. 综合勘探方法在成庄矿井地质构造探测中的应用[ J ]. 中国煤田地质,2002,14( 4 ):19 - 21.
[ 2 ] 程建远,李淅龙,张广忠,等. 煤矿井下地震勘探技术应用现状与发展展望[ J ]. 勘探地球物理进展,2009,12( 3 ):76 - 82.
[ 3 ] 汤友谊,陈江峰,彭立世. 无线电波坑道透视构造煤的研究[ J ]. 煤炭学报,2002,30( 7 ):254 - 258.
[ 4 ] 许 峰,杨茂林. 定向钻探技术在神东矿区防治水中的应用[ J ]. 矿业安全与环保,2017,44( 1 ):70 - 73. |
|
|
|