| Application practice of flexible network in final mining stage of fully mechanized mining face |
| Zhang Runtao |
| Baidong Mining Datong Co., Ltd, Jinneng Holding Coal Group, Datong 037029, China |
|
|
|
|
Abstract In order to successfully withdraw the equipment and hydraulic support of No. 8119 fully mechanized caving face in Baidong Mine, it was necessary to lay artificial roof at the end of mining stage. Aiming at the problems of high cost and poor safety of metal mesh with hydraulic support materials, a scheme of laying flexible mesh, anchor rod and anchor cable to fix wire rope was proposed. The flexible mesh was used to replace the traditional metal mesh and simplify the networking process. The results showed that the scheme accelerated the online speed, shortened the construction period, reduced the labor intensity of workers, improved the safety factor, and ensured the safe withdrawal of equipment and hydraulic support, which provided reference for the final mining stage of other working faces in the mine.
|
|
|
|
|
|
| [ 1 ] 胡志新. 三元煤业1312综采工作面支架回撤新工艺[ J ]. 煤,
2017( 10 ):49 - 50.
[ 2 ] 张宏斌. 应用高强度聚酯纤维柔性网撤面的探索与研究[ J ].
能源与节能,2015( 12 ):173 - 174.
[ 3 ] 王贝贝. 柔性树脂纤维网铺顶工艺在凉水井综采撤面中的应
用[ J ]. 能源技术与管理,2016( 4 )76 - 77,85.
[ 4 ] 韩纪志. 年产600万t综放工作面设备配套与技术研究[ D ].
沈阳:东北大学,2003.
[ 5 ] 黄东风. SZZ800/400型转载机的研制[ D ]. 哈尔滨:哈尔滨工
业大学,2013. |
|
|
|